Inspection Services

Fence Replacement Inspections

Final– After the fence has been installed. Including gate latches (Minimum 54” above finished grade), and all self-closing springs. Please reach out via email for the “answers to the final exam”, i.e. the document that outlines all code required provisions. Be prepared to submit pictures of the entire installation with the inspection request

Generator Inspections

Underground – After all below finished grade (underground) electrical conduit and gas lines been installed, gas line on test using small pressure gauge with min 3x working pressure.

Final – After the installation is complete. All panel boxes labeled, closed, and trenches covered.

Pool INspections

Steel – Upon installation of all pool shell steel. Prior to gunite placement.

P&E Trench

  • Electrical – After all electrical conduits, light niches and bonding ring are installed and terminated at the equipment pad.
  • Plumbing – All water distribution and autofill lines are installed underground. Trenches may be spot covered to avoid them floating in a chance of rain given all pipe joints are left exposed for inspection.
Finals – Pool and equipment complete. Panel boxes equipped with all pumps bonded, dead front covers installed, branch circuits labeled, gates compliant with 2018 ISPSC pool barrier requirements, alarms in place and operable. (House alarms do not comply with 85 decibel requirement)

Covered Patios and Pergolas

Note: Open pergolas only require foundation and final inspections. Electrical & Plumbing inspections are also required if applicable to the project.
Electrical Underground Inspection– After all below finished grade (underground) electrical conduit and gas lines have been installed, the gas line on test using a small pressure gauge with min 3x working pressure.
Plumbing Underground– Building drains properly bedded in place with open trench. Pipe material information facing up with a 10’ head of pressure.

Foundation Inspection– Formboards are set, and all beams have been excavated, wrapped with Poly, and reinforced according to the approved specifications. The foundation plans shall be emailed with the inspection request.

Framing inspection–  All Framing,  cornice, decking, and roof complete, before covering the rafters. Summer kitchen frame, rough plumbing and electrical, in place
 Final Inspection– The building is complete and ready for occupancy, but before any personal belongings are moved in. All structural, electrical, mechanical, and plumbing components are complete, and hot water is supplied. Appliances are not required at the time of inspection.

Solar and Backup Batterie installation Inspections

Rough in Inspection – After all conduits and rough wiring has been terminated in a code-approved manner outside the wall. Before covering walls and installing receptacles and covers.
Final Inspection – After the installation has been completed. Having a company representative from the company that performed the installation is helpful to take care of minor discrepancies, but not required.

EV Charger Inspections

Rough in– After all conduits and rough wiring has been terminated in a code-approved manner outside the wall, before covering walls and installing receptacles and covers.

Final Inspection – After the installation has been completed. All panel covers in place, labeled and receptacle face plates installed.

Residential New Construction, Remodels and Additions

Plumbing Underground

Building drains properly bedded in place with open trench. Pipe material information facing up with a 10’ head of pressure.

Foundation Piers

Holes are drilled and steel cages are in place.

Foundation 

Formboards are set, all beams have been excavated, wrapped with Poly, and reinforced according to the approved specifications. The foundation plans shall be emailed with the inspection request. 

Combination Frame & MEP Roughs

  • Framing – Including fire blocking, wall bracing, cornice and decking complete, with windows, doors, poly seal,  and moisture barrier installed and properly weather flashed.
  • Electrical – All circuits ran and terminated inside the panel.
  • Mechanical – All ducts, and boxes installed, properly secured to the structure, and sealed as required per the adopted IRC.
  • Plumbing – All new drainage, waste, and vent pipe terminated through the roof, properly secured, stud shoes and nail plates in place, and tested with water to minimum 6” above the flood level rim of the highest fixture. Vacuum breakers on hose bibs. All gas lines on test with a diaphragm gauge minimum 3x working pressure.

Energy Efficiency (Insulation)

Insulation installed and openings poly sealed. All condenser lines installed inside the walls, insulated, and protected from damage. All stickers showing energy efficiency rating must be on the windows.

Combination Finals

The building is complete and ready for occupancy, but before any personal belongings are moved in. All structural, energy efficiency, electrical, mechanical and plumbing components complete, and hot water supplied. Appliances are not required at time of inspection.  

Municipal Services

Software System Implementation Strategist

Work closely with System Administrator to tailor the permitting and inspection software system to the city’s specific needs. Once configured, creating standards and procedures, and training manuals for the use of the city-wide permitting system in all departments. We promise not to hold you hostage with our own software system. We will help you select and build the right system for your department.

Building Official Contracts

From taking consultation calls from City Officials to permitting department SOP’s, Commercial & Residential Plan Reviews and Inspections.