Rough in– After all conduits and rough wiring has been terminated in a code-approved manner outside the wall, before covering walls and installing receptacles and covers.
Final Inspection – After the installation has been completed. All panel covers in place, labeled and receptacle face plates installed.
Re-Inspection– Projects that are not ready for inspection when the inspector arrives, or require building code-related corrections