Steel Inspection – Upon installation of all pool shell steel. Before shotcrete placement.
P&E Trench Inspection
Final Inspection – Pool and equipment complete. Panel boxes equipped with all pumps bonded, dead front covers installed, branch circuits labeled, gates compliant with 2018 ISPSC pool barrier requirements, alarms in place, and operable. (House alarms do not comply with 85 decibel requirement)
Re-Inspection– Projects that are not ready for inspection when the inspector arrives, or require building code-related corrections