Rough in Inspection – after all conduits and rough wiring has been terminated in a code-approved manner outside the wall. Before covering walls and installing receptacles and covers.
Final Inspection – After the installation has been completed. Having a company representative from the company that performed the installation is helpful to take care of minor discrepancies, but not required.
Re-Inspection– Projects that are not ready for inspection when the inspector arrives, or require building code-related corrections