Solar Installations and Backup Batterie Installation Inspections

Rough in Inspection – after all conduits and rough wiring has been terminated in a code-approved manner outside the wall. Before covering walls and installing receptacles and covers.

Final Inspection – After the installation has been completed. Having a company representative from the company that performed the installation is helpful to take care of minor discrepancies, but not required.

Re-Inspection–  Projects that are not ready for inspection when the inspector arrives, or require building code-related corrections